Customization: | Available |
---|---|
Installation: | Floor Type |
Location: | Private Use |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Liquid cooled superfilled pile highlights:
Charging efficiency is significantly improved
Fast charging speed: the supercharge device has a high single-gun rated power, which can charge a large amount of electricity for the vehicle in a short time, and the supercharge pile can achieve the charging speed of "one kilometer per second", which greatly reduces the charging waiting time.
Short recharge time: the battery can be charged to 80% or more in half an hour, which greatly improves the efficiency compared with the traditional fast charging method, effectively alleviating the user's "battery anxiety".
Advanced equipment and technology
Liquid cooling technology: The use of liquid cooling system, high thermal conductivity, heat dissipation capacity than air cooling 30 times, can reduce the temperature of the charging equipment, extend the service life of the equipment, while making the charging gun line more lightweight, easy to operate.
High voltage and high current technology: high voltage overcharge technology has become the mainstream trend, compared with increasing the current, increasing the charging voltage can effectively reduce the heat release during the charging process, reduce energy loss, and improve the overall charging efficiency.
Product model | 480kW | 640kW | 800kW | ||
Input characteristic | Input standard | Three-phase five-wire (A+B++C+N+PE) | |||
Input voltage | AC380V±15% | ||||
Input power factor | ≥ 0.99 (50% load or more) | ||||
Input frequency | 45 ~65Hz | ||||
Input characteristic | Rated power | 480kW | 640kW | 800kW | |
Output voltage | DC200V~ DC1000V | ||||
Output constant power range | 300 ~ 1000VDC | ||||
Maximum output current of the machine | 1600A | 2133A | 2666A | ||
Number of output routes | Routes 1-12 | Routes1-16 | Routes1-16 | ||
Power distribution mode | Total matrix model | ||||
Voltage regulation accuracy | ≤±0. 5% | ||||
Steady flow accuracy | ≤±1% | ||||
Ripple coefficient | ± 1% | ||||
Maximum peak efficiency | ≥95% (50% load or more) | ||||
Safety design | enforce standards | GB/T 18487.1 -2023 ,GB/T 20234.3-2023 , GB/T 27930-2023 ,JJG 1149-2022 | |||
Safety function | Charging gun over temperature protection, over voltage protection, under voltage protection, over current protection, overload protection, short circuit protection, ground protection, environmental over temperature protection, insulation monitoring protection, polarity reverse connection protection, lightning protection, emergency stop protection, leakage protection, communication fault protection, output contactor adhesion protection. | ||||
Environmental index | Operating temperature | -30ºC ~ + 50ºC (Derating works above 50 ° C) | |||
Relative humidity | 5%-95%no condensation cream | ||||
Working altitude | ≤2000m (Derating above 2000m is required), do not use this device in areas above 3000m | ||||
Atmospheric pressure | 70kPa ~ 106kPa | ||||
Class of protection | IP 54/IP 55 | ||||
Cooling mode | Air cooling | ||||
Noise control | ≤65dB | ||||
Installation mode | Floor type | ||||
Functional design | Single gun output current range | Air cooling terminal: 5-250A | Liquid cooled supercharge terminal:5-600A | ||
BMS secondary source | 12Vdc | ||||
Man-machine interface | Color display | ||||
Charging mode | Automatic charging (APP or screen stop charging at any time) | ||||
Charging mode | Scan code, swipe card, VIN start | ||||
Networking mode | Ethernet /4G | ||||
Double charge | support | ||||
Remote upgrade | support | ||||
Safety function | Charging gun over temperature protection, over voltage protection, over current protection, overload protection, short circuit protection, grounding protection, | ||||
Insulation monitoring protection, polarity reverse connection protection, emergency stop protection, leakage protection, communication fault protection, output contactor adhesion protection, etc |
Q:What is your terms of payment?
A:online fast payment,T/T
Q:Do you test all your chargers before shipping?
A: All major components are tested before assembly and each charger is fully tested before shipped
Q:How long to fully charge a car?
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw,then 40/22=1.8hours.
Q:Are you Trading Company or manufacturer?
A: We are professional EV charger manufacturer.